Mazda 13B-MSP Instalační manuál Strana 9

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 18
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 8
3. Turbo Kit Installation
3-1 Intake Manifold Plate Installation
1. Remove the extension manifold (upper).
Please refer to RX8 workshop manual pages
01-13-4 to 01-13-11.
* Make sure to prevent any dirt or objects from
entering the intake manifold.
2. Install the Intake Manifold Blocking Plate onto
the manifold as shown in the picture.
(Parts Used #49)
3. Apply silicone gasket to the manifold surface
shown in the picture. Make sure the manifold
is clean before installing. You do not need to
apply silicone gasket to factory o rings.
Replace O rings if necessary.
4. Install extension manifold back onto intake
manifold. Refer to RX8 workshop manual.
3-2 Thermo Cloth Installation
1. Apply the provided Thermo Tape to the fire wall
around the exhaust manifold. (To secure the
Thermo Tape, Apply Aluminum tape on the
edges)
2. Bend and push the heat shield on the chassis
more against the body.
(Parts Used #51)
Caution!
It is very important to protect the parts surrounding the exhaust manifold and turbo from high
temperature. Improper installation of the thermo barrier may cause damage and fire.
Zobrazit stránku 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 17 18

Komentáře k této Příručce

Žádné komentáře